Agenda item

17/01330/FUL - 12 Birch Close, Earl Shilton

Application for demolition of existing dwelling and erection of 16 dwellings with associated vehicular access, parking and landscaping.

 

‘Late items:’

 

Consultations

 

No objection subject to condition received from:-

 

Leicestershire County Council (Highways)

Lead Local Flood Authority

 

Appraisal

 

Highways

 

The applicant has provided full details of the proposed access layout serving the site, which has been subject to consultation with Leicestershire County Council (Highways). The proposed access serving the site would comply with the Leicestershire Highway Design Guide and subject to detailed design would be capable of adoption. Therefore subject to the imposition of conditions relating to parking, turning and site drainage, Leicestershire County Council (Highways) would have no objection to the proposed development. The proposal would therefore not result in any highway safety issues and would accord with Policies DM17 and DM18 of the SADMP.  

 

Drainage

 

During the course of the application further information was received which confirms that the proposed development would provide an acceptable and viable drainage strategy, with permeable paving which would be maintained to provide surface water drainage across the site. The Lead Local Flood Authority have reviewed this information and have no objections to the proposed development subject to the imposition of conditions, which relate to the management of surface water run off during construction, the submission of a detailed surface water drainage scheme, a long term maintenance scheme for the proposed Sustainable urban Drainage system and infiltration testing. The proposal would not therefore create or exacerbate flooding and is considered to accord with Policy DM7 of the SADMP.

 

11        Recommendation

 

11.1     Grant planning permission subject to the following conditions:

 

Amend condition 2 to the following:-

 

The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans: Site Location Plan Dwg No. 4391/KP/17/001, Proposed elevations and floor plans, 2 Bed 4 Persons House Dwg No.4391/KP/17/010, proposed elevations and floor plans 3 Bed 5 Persons house Dwg No.4391/KP/17/011 received 22 December 2017, Proposed site plan Dwg No. 4391/KP/17/003 Rev J, Proposed floorplan and elevations 2 bed, 4 persons bungalow Dwg No.4391/KP/17/012 Rev A, received by the Local Planning Authority on the 13 April 2018. Highway access layout, Dwg No. FW1419-LE-D-510 Rev A3, received by the Local Planning Authority on the 13 June 2018.

 

Reason: To ensure a satisfactory impact of the development to accord with Policy DM1 of the adopted Site Allocations and Development Management Policies DPD.

 

Replace condition 13 with the following condition:-

 

The access into the development hereby approved, shall be carried out in accordance with the arrangement shown on arrow Walsh Consulting drawing number FW1419-LE-D-510 A3, received on the 13 June 2018 shall be implemented and completed before any dwelling hereby permitted is first occupied and shall thereafter be permanently so maintained.

 

Reason: To ensure that vehicles entering and leaving the site may pass each other clear of the highway and not cause problems or dangers within the highway in accordance with Policy DM17 of the Site Allocations and Development Management Policies DPD.

 

Reword condition 14 with the following condition:-

 

Prior to occupation of the development hereby approved areas of parking and turning facilities shall be provided, hard surfaced and marked out in accordance with Dwg No 4391/KP/17/003 rev J received 13 April 2018. Parking areas shall be retained and maintained thereafter.

 

Reason: To ensure that there is adequate parking provision to serve the development, and avoid on street parking to accord with Policies DM17 and DM18 of the Site Allocations and Development Management Policies DPD.

 

Add the following conditions:-

 

16.       No development shall commence on the site until such time as a construction traffic management plan, including as a minimum details of, wheel cleansing facilities, vehicle parking facilities, and a timetable for their provision, has been submitted to and approved in writing by the Local Planning Authority. The construction of the development shall thereafter be carried out in accordance with the approved details and timetable.

 

Reason: To reduce the possibility of deleterious material (mud, stones etc.) being deposited in the highway and becoming a hazard for road users, to ensure that construction traffic does not use unsatisfactory roads and lead to on-street parking problems in the area to accord with Policies DM17 and DM18 of the Site Allocations and Development Management Policies DPD.

 

17.       Prior to commencement of development  details in relation to the management of surface water on site during construction of the development shall be submitted to, and approved in writing by, the Local Planning Authority. Details should demonstrate how surface water will be managed on site to prevent an increase in flood risk during the various construction stages of development from initial site works through to completion. This shall include temporary attenuation, additional treatment, controls, maintenance and protection. Details regarding the protection of any proposed infiltration areas should also be provided.         

 

Reason: To prevent any increase in flood risk, maintain the existing surface water runoff quality and to prevent damage to the final water management systems through the entire development construction phase in accordance with Policy DM7 of the Site Allocations and Development Management Policies DPD.

18.       Prior to commencement of development details in relation to the long term maintenance of the sustainable surface water drainage system on the development shall be submitted to and approved in writing by the Local Planning Authority. Details of the SuDS Maintenance Plan should include for routine maintenance, remedial actions and monitoring of the separate elements of the system and should also include procedures that must be implemented in the event of pollution incidents within the development site.

 

Reason: To establish a suitable maintenance regime that may be monitored over time; that will ensure the long term performance, both in terms of flood risk and water quality, of the sustainable drainage system within the proposed development in accordance with Policy DM7 of the Site Allocations and Development Management Policies DPD.

 

19.       Prior to commencement, infiltration testing shall be carried out to demonstrate the suitability of the site for the use of infiltration as a drainage element, the flood risk assessment (FRA) shall be updated accordingly to reflect the drainage strategy. The updated FRA and drainage strategy shall be submitted to and agreed by the Local Planning Authority. The approved details shall be implemented and completed prior to first occupation of the development. 

 

Reason: To demonstrate that the site is suitable for the use of infiltration techniques as part of the drainage strategy to accord with Policy DM7 of the Site Allocations and Development Management Policies DPD.

 

Additional notes to applicant:

 

4.         If there are any works proposed as part of an application which are likely to affect flows in a watercourse or ditch, then the applicant may require consent under Section 23 of The Land Drainage Act 1991. This is in addition to any planning permission that may be granted. Guidance on this process and a sample application form can be found at the following: http://www.leicestershire.gov.uk/Flood-risk-management.

 

5.         Maintenance, Please note, it is the responsibility of the Local Planning Authority under the DEFRA/DCLG legislation (April 2015) to ensure that a system to facilitate the future maintenance of SuDS features can be managed and maintained in perpetuity before commencement of the works.

 

6.         The scheme shall include the utilisation of holding sustainable drainage techniques with the incorporation of sufficient treatment trains to maintain or improve the existing water quality; the limitation of surface water run-off to equivalent greenfield rates; the ability to accommodate surface water run-off on-site up to the critical 1 in 100 year return period event plus an appropriate allowance for climate change, based upon the submission of drainage calculations; and the responsibility for the future maintenance of drainage features.

 

7.         Full details for the drainage proposal should be supplied, including but not limited to, headwall details, pipe protection details (e.g. trash screens), long sections and full model scenarios for the 1 in 1, 1 in 30 and 1 in 100 year plus climate change.

 

8.         Details should demonstrate how surface water will be managed on site to prevent an increase in flood risk during the various construction stages of development from initial site works through to completion. This shall include temporary attenuation, additional treatment, controls, maintenance and protection. Details regarding the protection of any proposed infiltration areas should also be provided.

 

9.         Details of the SuDS Maintenance Plan should include for routine maintenance, remedial actions and monitoring of the separate elements of the system, and should also include procedures that must be implemented in the event of pollution incidents within the development site.

 

10.       The results should conform to BRE Digest 365 Soakaway Design. The LLFA would accept the proposal of an alternative drainage strategy that could be used should infiltration results support an alternative approach.

 

 

Minutes:

Application for demolition of existing dwelling and erection of 16 dwellings with associated vehicular access, parking and landscaping.

 

It was moved by Councillor Crooks, seconded by Councillor Lynch and

 

RESOLVED

 

(i)            Permission be granted subject to:

 

a.    Prior completion of a S106 agreement to secure 100% affordable housing;

 

b.    The conditions outlined in the officer’s report and late items.

 

(ii)           The interim Head of Planning be granted delegated powers to determine the final detail of planning conditions;

 

(iii)          The Interim Head of Planning be granted delegated powers to determine the terms of the S106 agreement including trigger points and claw back periods.